Specializing in BMP Design and Construction
TRPA Certified Site Evaluator for BMP's

logo2

   
HOME      BMP's      PAVER DRIVEWAYS       ASPHALT SEALING       PATIOS     ROCK VENEER   LINKS &CONTACT     
   

 

rocks under water

 

Even if you have a plan or design already in hand - Ask for an evaluation ...

Often times there can be redesigns to result in a more economical or aesthetically pleasing installation...

 

east shore lake tahoe wintertime

 

BMP's - Planning and Installation Expertise

With specialization in planning and installing BMP's and training by TRPA in creating plans that will pass permit requirements - Tieslau Excavating offers a one stop option for your needs.

Bids are free

BMP Plans with TRPA Stamp and approval are $200 - This amount is reimbursed if you choose Tieslau Excavating to complete the project.

You can request a plan from the TRPA directly - the waiting list can be up to 9 months long.

If you have a plan already in hand, let me revise it for free and show you where you cut costs without compromising function.

About BMP's

BMP's, Best Management Practices, are required by TRPA for every home and property in the Tahoe Basin. 
All precipitation that falls on one's house and property must remain on the property and any erosion must be halted. 
This is accomplished in many ways including:
1) gravel trenches along house drip lines
2) slotted drain at the end of the driveway
3) rock walls or terracing to stabilize steep dirt slopes
4)  water retention basins
           

The sizing of these items depend on how fast the soil absorbs water for your property. This is referred to as the soil infiltration rate. For more detailed information on soil and water clarity, see the TRPA link on the links page.

Contact us NOW for a FREE Estimate!

Paul Tieslau

PO box 16183

S. Lake Tahoe , CA 96151

(530) 318-0116 ~ cell

tieslau@laketahoebmp.com

CA Lic# 916535

With 14 years in Tahoe, I have the knowledge of the special needs of the area...

stacked rocks and grass

I am very familiar with Permits & Practices and work on a regular basis with the TRPA, City and County building Departments...

~~~~

Be sure to beat the deadlines for BMP installation!

The last day to excavate in Tahoe is October 15th

 

   
.
   

 

 

Web Design By: GirlFriday Productions

Copyright Summer 2009